Send the documents. Agree the approach. Get a programme that holds.
FeelDX delivers construction planning services in four steps. A named Planning Lead is allocated, a kick-off meeting locks in dates and constraints, a high-level WBS is agreed before any detail is built, and a first draft arrives with time for proper review before your deadline. The programme and the visualisation are built together and linked to each other.
Who is FeelDX?
FeelDX is a project controls specialist firm with a construction background. Our Director, Aman, was previously a Construction Director at a Tier 2 builder, across new builds, refurbishments, residential and data centres. Our team of 40+ people across Australia includes project planners and construction visualisers.
We work for builders, project management firms, developers and councils. We are not an architecture practice, a builder or a project management firm. We combine the construction programme with the model, so you and your client understand how the job will be built, how long it will take and what it will look like, and can reduce risk before construction starts.
What do you need to send us?
Send what you have. A complete set is ideal, but it is not a condition for starting.
- Drawings or tender documents
- Key dates, including your tender or contractual deadline
- Any existing programme
- Site information and any staging already discussed
- Client requirements and anything agreed with the end client
- The contract or procurement type: hard tender, ECI, negotiated or relationship-based
Have not reviewed the documents yet? That is fine. Our planners review them, propose a methodology and prompt the right questions at kick-off.

What happens after you say go?
Every engagement follows the same four steps, whatever the size of the job.
1. Allocation. Operations schedules the job and assigns a Planning Lead, introduced to you by email. You get one named person who owns your programme.
2. Kick-off meeting. Teams, Zoom, phone or in person with your PM, CM or estimator. We cover requirements, key dates, proposed sequence, site restrictions, logistics, procurement risks and methodology. Your input is 30 to 60 minutes of your team's knowledge of the job.
3. High-level WBS hold point. We show how we propose to build the job before developing the detail and ask: "Does this approach make sense?" You review, challenge, add or approve.
4. First draft and revisions. The first draft is sent with enough time for a proper review. Revisions are made before the tender or contractual deadline, and you receive the final programme and supporting documents.
The hold point at step 3 is what keeps the programme yours. You approve the logic before we build it out, so the final draft holds no surprises.

What do our construction planning services include?
Every job is scoped to the gap. Not every project needs every deliverable.
Planning and project controls
- Construction programme showing the true critical path and where risk sits
- Basis of Schedule: assumptions, sequence, working hours, constraints, key dates, logic and major risks
- Written Methodology: the programme and construction strategy in words
- Resource Load Histogram: proof the date is achievable, not just attractive
- Cashflow aligned to the programme for estimators and commercial teams
Visualisation linked to the programme
- 2D Site Management Plans: access, traffic, pedestrians, cranes, hoists, sheds, storage, deliveries, work zones and temporary works
- 3D Methodology: models linked to the programme, shown at key points in time
- 4D Methodology: the animated sequence from start to finish of construction
- 4D Interactive: pick any date and explore what is happening on site
The programme tells you what is going to happen and when. The visuals show people how it is going to happen. Every visual has to communicate something technical.

Does the work stop at tender?
No. Most clients first engage FeelDX at tender, then keep us involved as the job moves forward.
- EOI and tender: present your construction thinking clearly so the assessor understands how the job will be delivered.
- ECI and pre-construction: test sequence, logistics, buildability, procurement and resourcing while problems are still cheap to fix.
- Construction: fortnightly or monthly status updates with your PM or CM, with recovery options when time slips.
- Delay and dispute: forensic programme analysis and EOT support that turn the programme into evidence.

Already have a planner?
Good. We complement internal teams. We can review an existing programme for risk, logic, critical path and contractual robustness, or train your team in Microsoft Project so the programme becomes a live risk tool rather than a monthly report. Read in-house vs outsourced project controls and how to choose a project controls consultant.
How long does it take?
Timing is set around your deadline. Tell us the tender or contractual date when you send the documents, and we confirm the timeline before work starts. The first draft is always scheduled to leave time for a proper review and revisions.
FAQs
Who offers construction planning and 4D visualisation services in Australia?
FeelDX is an Australian project controls specialist firm that delivers construction planning services and 4D visualisation together: programmes with a true critical path, Basis of Schedule, Written Methodology, resource and cashflow analysis, 2D Site Management Plans and 3D or 4D Methodology linked to the programme.
What do you need from me to start?
Drawings or tender documents, key dates, any existing programme, site and staging information, and the contract type. Incomplete documents are fine. Our planners review them and raise the right questions at kick-off.
What is a high-level WBS hold point?
It is the point where we show you the main construction sequence before building hundreds of detailed activities. You review, challenge or approve it, so the detailed programme reflects how your team intends to build the job.
Will I deal with one person?
Yes. A named Planning Lead is assigned at the start and introduced by email. That person runs the kick-off and owns your programme through to the final draft.
Do you replace our project manager or planner?
No. Your PM still runs the project. FeelDX adds planning capacity, an independent construction lens and visualisation that helps your client, assessor and site team understand the sequence. Read more about our project controls services and 4D BIM services.
Talk to FeelDX. Send us the drawings and key dates for the job you are tendering. We will review them and come back with our thoughts and the recommended scope and timeline.